Dewatering 

Maggiora and Ghillotti installed two 24 inch culverts, each one mile long, and a sheet pile dam to divert flows during construction. The pipes were floated down the channel on top of the water, then remained partially bouyant when filled until the channel was dewatered.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 141 times.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 131 times.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 148 times.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 135 times.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 143 times.

2011-10-03 Dewatering
2011-10-03 Dewatering *
Viewed: 140 times.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 143 times.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 293 times.

2011-10-03 Dewatering
2011-10-03 Dewatering
Viewed: 118 times.

* Comments available for this item.