|
|||||||||||||||||||||||||||
In 2007, with support from the DWR Urban Streams Program, the LPCCC installed a series of rock vanes to help stabilize eroding banks on Dry Creek below Highway 128. This album contains photos showing selected locations at high flows and immediately following high flows on January 4 and January 6, 2008.
|